Skip to content

Techniques Work

  • Home
  • Construction
  • Painting
  • Plumbing
  • Terms of Service
    • Copyright
    • Privacy Policy
  • Contact Us
  • Site Map
× Close Menu
Open Menu

Construction

Ways to Strengthen Circular Column Formwork
August 23, 2025

Ways to Strengthen Circular Column Formwork

Construction

For the pouring work of the column, we usually use the mold, and one of the most important aspects of the use of the mold…

Admin
% Steel required in RCC Structure 5M³ of Concrete.
August 21, 2025

% Steel required in RCC Structure 5M³ of Concrete.

Construction

For a structure using 5m³ of concrete, the steel required can be estimated at 392.5 kg for a slab (1%), 785 kg for a beam (2%),…

Admin

Recent Posts

  • DIY Plaster Repair: We Finally Put the Skim in Skim Coat.
  • Plumbing Basics
  • Ways to Strengthen Circular Column Formwork
  • How to Paint Wood Paneling Like a Pro
  • % Steel required in RCC Structure 5M³ of Concrete.

Recent Comments

No comments to show.
© 2025 Techniques Work
 / Theme: Really Simple / License: GPLv3